|
|
The application of integrated geophysical exploration to the hydrogeology discrimination of the large fracture tunnel construction period |
HU Bo-Wen1,2, CHEN Li2, YAO Hong-Chao2, ZHANG Fa-Wang3, ZHANG Jin1, ZHAO Miao1 |
1. Shijiazhuang University of Economics, Shijiazhuang 050031, China;
2. Institute of Hydrogeology and Environmental Geology, GAGS, Shijiazhuang 050061, China;
3. Institute of Karst Geology, GAGS, Guilin 541004, China |
|
|
Abstract When the coal roadway crosses fracture construction, efficient integrated geophysical prospecting technology is often used to determine its water content. However, with the popularization of the integrated geophysical exploration technique, researchers have gradually found that its exploration precision is not high. In combination with the coal mine roadway construction in an ancient city of Shanxi, the authors selected the integrated geophysical prospecting method in combination with water chemical isotope verification and clearly revealed the hydrogeological condition of the coal roadway construction period, thus making up the defect of the integrated geophysical exploration whose accuracy is not high. It is shown that integrated geophysical exploration technique in combination with water chemical isotope can greatly reduce the hidden dangers in the coal roadway construction. The results achieved by the authors provide a demonstration for the same or similar coal roadway engineering construction.
|
Received: 07 November 2014
Published: 10 August 2015
|
|
|
|
|
[1] |
CHEN Xiu-Juan, LIU Zhi-Di, LIU Yu-Xi, CHAI Hui-Qiang, WANG Yong. Research into the pore structure of tight reservoirs:A review[J]. Geophysical and Geochemical Exploration, 2022, 46(1): 22-31. |
[2] |
XIAO Guan-Hua, ZHANG Wei, CHEN Heng-Chun, ZHUO Wu, WANG Yan-Jun, REN Li-Ying. Application of shallow seismic reflection surveys in the exploration of urban underground space in Jinan[J]. Geophysical and Geochemical Exploration, 2022, 46(1): 96-103. |
|
|
|
|