结合时序InSAR与IRIME-LSTM模型的大范围矿区地表沉降预测 |
| 陈兰兰, 范永超, 肖海平, 万俊辉, 陈磊 |
|
Predicting surface subsidence in large-scale mining areas based on time-series InSAR and the IRIME-LSTM model |
| CEHN Lanlan, FAN Yongchao, XIAO Haiping, WAN Junhui, CHEN Lei |
| 图5 SBAS-InSAR与PS-InSAR监测形变速率相关性 |
| Fig.5 Correlation of subsidence rate of SBAS-InSAR and PS-InSAR monitoring |
|