As marine geological surveys continue to deepen, there is an urgent need to develop new-generation information technologies to accelerate the transformation of marine geological survey pattern. In recent years, the digital marine geological project has developed a comprehensive framework of trinity that integrates geological cloud, big data, and intellectualization based on the practical needs of marine geological surveys. Furthermore, the planning of three major systems, i.e., the support, core, and key systems, has been proposed for marine geological informatization. These suggest significant progress in the construction of marine geological cloud platform, marine geological big data infrastructure, and intelligent applications in marine geology. The progress also includes the building of professional marine geological nodes and network systems, the formation of a national marine geological data resource system, and the advancement in the intelligent application of marine geological operations. Information-based construction have played a full role in promoting the transformation and upgrading of geological surveys, while also serving natural resources management.
孙记红, 魏合龙, 苏国辉, 陈宏文, 刘京鹏, 林文荣, 王诏, 张兆代. 海洋地质信息化建设进展[J]. 自然资源遥感, 2025, 37(1): 1-7.
SUN Jihong, WEI Helong, SU Guohui, CHEN Hongwen, LIU Jingpeng, LIN Wenrong, WANG Zhao, ZHANG Zhaodai. Progress in the information-based construction of marine geology. Remote Sensing for Natural Resources, 2025, 37(1): 1-7.
Dai Q F, Wei H L, Su G H, et al. Construction of informatization service system for marine geological big data[J]. Marine Geology Frontiers, 2017, 33(11): 67-70.
Sun J H, Su G H, Lin F, et al. Construction of marine geological information service system[J]. China Geological Survey Results News, 2019, 5(1): 18-22.
[6]
戴勤奋. 海洋地质数据库内容与结构[R]. 北京: 中国地质调查局, 2021.
Dai Q F. Content and structure of marine geological database[R]. Beijing: China geology survey, 2021.
[7]
Sun J H, Wei H L. Construction method of marine geological data service platform based on object-oriented approach[J]. ICIC Express Letters,Part B: Applications, 2015, 6(8): 2047-2052.
Sun J H, He S F, Wei H L, et al. Structure method of marine geological database application model[J]. Computer Technology and Development, 2013, 23(12): 194-198.
Song H R, Lin F, Su G H, et al. Improvement of data entry system for marine geological survey database[J]. Marine Geology Frontiers, 2016, 32(2): 66-70.
Sun J H, Wei H L, Lin W R, et al. Design and running of supporting system to the whole-process informatization of marine geological survey[J]. Marine Geology Frontiers, 2023, 39(2): 49-55.
Chen Q, Su G H, Wei H L, et al. Selection of parameters for simulation of net ecosystem carbon flux in Yancheng coastal wetland, Jiangsu[J]. Marine Geology Frontiers, 2023, 39(2): 56-65.
[12]
Sheng J, Sun J H, Bai Y L, et al. Evaluation of hydrocarbon potential using fuzzy AHP-based grey relational analysis:A case study in the Laoshan Uplift, South Yellow Sea, China[J]. Journal of Geophysics and Engineering, 2020, 17 (1): 189-202.
doi: 10.1093/jge/gxz107
Sun J H, Wei H L, Wang Z, et al. 3D model construction of geological bodies in key marine areas based on Open Inventor[J]. Marine Geology Frontiers, 2018, 34(3): 39-45.